Uptown Bus Rapid Transitway and Terminal Advanced Planning

Houston METRO has incorporated bus rapid transit (BRT) as a significant part of the region’s long-term plans, and Houston’s first foray into BRT is located along Post Oak Boulevard in the Uptown area. TGC was in on the ground floor of this trend when we completed the advanced planning for the Uptown BRT Transitway and Terminal in 2012. 

Our detailed, technical study quantified significant demand to Uptown along US 59 based on a detailed analysis of the Houston region Transportation Demand Forecast model. As part of the study, TGC analyzed METRO’s park-and-ride activity within the project capture area to determine the facilities’ capacity to sustain an additional commuter line; drafted operating options based on a two-step evaluation process; completed a site selection and environmental review for the US 59 transit way and intermodal terminal; completed preliminary engineering for highway and ramp improvements, and terminal facilities; and estimated annual commuter service operating costs.

At full buildout, the project reflects a t-ramp on US 59 connecting to an intermodal facility to serve commuters and bus rapid transit riders; a parking garage; portal improvements under US 59 to Post Oak Boulevard; and BRT transit services along dedicated lanes on Post Oak Boulevard. Uptown’s investment in commuter services and BRT garnered support from TxDOT in a first-of-its-kind venture that includes state highway dollars allocated to a mass transit project along US 59 and IH-610, both of which are some of Houston’s most clogged freeways.

TGC’s work was critical to developing data to inform a vision of services around which public and political consensus could form. Uptown utilized the TGC study to secure $61.8M in federal CMAQ and STP funding for the project.

 
TGC was integral to the advancing of the concept and planning efforts of the Post Oak Bus Rapid Transit project. I have, and will continue to, recommend TGC and their work.
— John Breeding, Administrator, Uptown Development Authority

Project Construction | Source: TGC

Project Completion | Source: TGC

 

Sectors: Transit Planning; Environmental; Roadway & Infrastructure Design; Intergovernmental Relations & Funding Pursuit; Grant Management, Compliance & Procurement

Services: Advanced Planning, Civil Rights & Compliance, Procurement, Demand Analysis, Environmental Assessment, Intergovernmental Coordination, Funding Pursuit