The Goodman Corporation (TGC), in cooperation with Walter P Moore Engineering, performed a pre-engineering report for the FM 830 corridor. The project is located within and on the periphery of the City of Conroe and will be adjacent to a large Hughes Corporation mixed use development called Woodland Hills. The widening of the facility is a priority of both entities. Although funds have been pursued for the project in the past, the applications have been unsuccessful. The pre-engineering report validates the assumptions of the project sponsors that the project will provide great mobility improvements at a positive cost-benefit ratio.

The FM 830 pre-engineering report defined the following: project purpose, project need, the monetized benefits that will result from the project, and line item costs required to implement the project. The report also provided a desktop EA/NEPA analysis for the project corridor.

THEGOODMANCORP.COM

 

SERVICES PROVIDED

Traffic Analysis
Benefit Quantification and Monetization Micro-and Macrosimulation
Opinion of Probable Cost
Traffic Counts and Projections Environmental Site Assessment

TIMEFRAME

July 2016 - November 2016